Location

Kemps Creek, New South Wales

Client

Transport for NSW

Sector

Transport

  • Bridge
  • Road

Duration

2022 – 2025

Contract value

 $400 million

M12 Motorway (Central) 

Fast facts

11

bridges

177

bridge piles

1,600,000

tonnes of bulk earthworks

12

trainees

252

bridge girders

800,000 m3

of earthworks (cut to fill and cut to spoil)

About

The M12 Motorway is an integral part of the $4.4 billion Western Sydney Infrastructure Plan. The new motorway will deliver significant travel time reductions and increased travel time reliability to road users and freight operators, by providing a high standard and efficient connection to Western Sydney Airport and connect to Sydney’s motorway network.

Seymour Whyte will deliver a 7.5km dual-carriageway motorway, 11 bridges, cycle and pedestrian paths, networks, intelligent transport systems and green areas.

The project is targeting an ‘Excellent’ infrastructure sustainability rating – with the Infrastructure Sustainability Council – by reusing and recycling 95% of the excavated materials, using 40% of recycled aggregates for the sub-base layers and minimising water use on the site.

The motorway dual carriageway has a wide median to allow for future widening to six lanes; and safety barriers will be placed along the length of the motorway. Emergency stopping bays and emergency crossovers will also be at regular intervals.

The motorway will increase road capacity, reduce congestion, and improve travel times and freight movement in and through Western Sydney.

A shared user path with lighting will provide an active transport link along the motorway and eastward to the M7.

The M12 Central package includes the following bridges:

  • Twin bridges over South Creek
  • A bridge for Clifton Avenue over the M12 Motorway
  • Twin bridges over Kemps Creek
  • Twin bridges over Elizabeth Drive near Mamre Road
  • Twin bridges over Range Road
  • A bridge for the Water Tower Access Road over the M12 Motorway
  • A private property access bridge in University of Sydney land.

The works will provide retaining walls near Range Road to limit project impacts and will adjust local roads, including Clifton Avenue and Salisbury Road.

Hours of work

Our work hours are between 7am and 6pm from Monday to Friday and 8am and 6pm on Saturdays. There will be no work on public holidays.

We will continue to keep the community informed of work needed to be completed outside of these hours.

Contact us

Phone: 1800 517 155 (option 2)

Email: M12central@seymourwhyte.com.au

Mail: PO Box 53 Kemps Creek NSW 2178

Project webpage:  M12 Motorway

EOI for work packages

You can register your interest for work packages on Seymour Whyte’s central section of the M12 Motorway project between Badgerys Creek and Cecil Park. Register here via ICN Gateway.