Naarm Way Stage 1 & 2
Fast facts
Pavement
Asphalt
PFAS material recycled
Kerb and channel
Vehicles per day
Waste diversion rate
About
Naarm Way Stages 1 & 2 is a staged upgrade of Melbourne Airport’s landside road network, delivered within a fully operational airport precinct supporting 24/7 operations, high traffic volumes and critical passenger interfaces. Delivered across two successive contracts, the program progressively expanded elevated road connectivity between T1, T2, T3 and T4, improving access reliability and capacity while maintaining uninterrupted airport operations.
As one of Victoria’s largest private road investments for public use, Naarm Way responds to growing demand across the airport precinct, where an average of 124,000 vehicle trips occur to and from the airport each weekday and traffic increases by up to 8 percent during peak periods. Delivered within a fully operational airport environment, Naarm Way will reduce congestion, accommodate future growth and maintain safe, reliable access for passengers, staff, public transport and critical terminal interfaces.
Stage 1 – T4 Express Link (T4EL) comprised the design and construction of the first elevated road connection between the Tullamarine Freeway and the Terminal 4 ground transport hub, forming the initial stage of Melbourne Airport’s broader elevated road strategy to improve access, reliability and resilience within a live, operating airport.
Stage 2 – Elevated Roads and Forecourt (ERF) extended the elevated network beyond T4, delivering three new elevated ramps (some 43 spans and a 10,800m2 deck footprint) and road connections to Terminal 1, 2 and 3 precincts and back to Tullamarine Fwy.
For more project information visit Melbourne Airport